Landlord & Property Management Legal Guide | Global Phoenix Law ·
Map accessible entrances before deciding which floor is ground level
Use site access and arrival points to identify potential ground floors in a non-elevator multifamily building.
Draw the building's arrival points and entrances before labelling the ground-floor units for a Fair Housing Act design review. Include changes in site level, parking connections and the route to each entrance. A simple marked plan gives the accessibility professional a clearer starting point than one floor name used by residents or a leasing office.
HUD and DOJ's design statement explains that a non-elevator building can have more than one ground floor. It refers to the regulatory definition of a ground floor as a floor with a building entrance on an accessible route. The analysis therefore follows the building's actual configuration rather than assuming only the lowest numbered level matters.
The statement gives an example of a building on a slope, with an upper story at grade on one side and a lower story at grade on the other. Entrances on both sides produce two ground floors in that example. Record the slope and entrance arrangement if the property has a similar layout, then have the actual facts reviewed.
Another example describes a residential building connected to a parking garage by walkways at several levels. Arrival points and access connections can affect the coverage analysis. Keep the parking plan with the residential drawings so the reviewer can see the complete route instead of examining the apartment floor plan in isolation.
For example, a manager preparing a review can label the street entrance, rear parking entrance and connecting walkways, take dated photographs and identify which plans show each connection. Any uncertain route or alteration should be marked as a question. The drawing is a fact-gathering tool, not a self-issued compliance certification.
Use the current design statement, including its August 2026 notice withdrawing the answer to Question 59, and seek qualified advice about applicable standards. The agencies' reasonable-modification guidance addresses a different issue: structural changes requested for an existing premises. Keep those individual requests in their own file while the building's design coverage is evaluated.
In the site's shop, compare measuring tools, plan folders and accessible-home equipment against the verified route and approved work. Save dimensions and specifications in the property file so later product purchases do not accidentally obstruct the entrance or path the review identified.
Sources and further reading
This is general information. Check the relevant authority or manufacturer for the rules, compatibility and terms that apply to your situation.
More practical guides